Fire Rated Walls

Bridgend · Wales

Fire Rated Walls in Maesteg

If your project in Maesteg or Tonypandy needs fire rated walls, we can match you with a specialist.

Start your Maesteg fire rated wall quote in two minutes.

Free Fire Rated Walls quote in Maesteg

No obligation. We only use your details to reply about this job.

Maesteg and the surrounding area

Maesteg falls within Bridgend, Wales. Postcodes we cover here include CF34. Nearby places we also cover include Pontycymer, Blaengarw, Bettws, Croeserw and Pont Rhyd-y-cyff.

Working in Maesteg

Wales has a lot of stone-built and terraced housing in its valleys and towns, and a wetter climate than most of England. Older Maesteg houses converted into flats frequently need compartment walls and floors improved. HMOs in Maesteg may need fire rated wall upgrades as part of licensing by Bridgend.

Barn conversions near Maesteg often need fire separation between living areas and any retained agricultural or garage space. Rural homes around Maesteg adding annexes may need fire rated walls where the annex joins the main house.

Guide prices for Maesteg

  • Upgrade existing wall to 30 minutes: £35–£65 per m². Overboarding an existing sound wall with fire-resisting plasterboard and sealing edges.
  • 60 minute stud partition: £75–£120 per m². Two layers of fire-resisting board each side with mineral wool where specified.
  • 30 minute stud partition: £55–£85 per m². Metal stud with fire-resisting board each side, taped and filled, typical domestic build.

Prices are a guide. Your quote for Maesteg is a fixed price based on the details you give us. Full price guide.

Fire Rated Walls questions from Maesteg

How do I get a fire rated wall quote in Maesteg?

Use our quote form with your Maesteg postcode, the wall's purpose, size and required rating. Drawings or Building Control notes help. A specialist will give you a fixed price.

Does my Maesteg garage wall need to be fire rated?

If your garage is integral or attached, the wall and ceiling between it and your Maesteg home should be fire-resisting, typically 30 minutes, with a self-closing fire door.

Will you provide records for Building Control in Maesteg?

Yes. Installers in Maesteg name the tested system used and provide photos of board layers and fire stopping, which helps sign-off by Building Control.

How long does fire rated wall work take in Maesteg?

Most domestic fire rated walls in Maesteg take one to three days. Loft stair protection takes two to five days, and commercial projects vary with size and access.

Can I put a socket in a fire rated wall?

Yes, but the socket box breaks the fire-resisting board, so it must be protected. Common methods are intumescent putty pads behind the box or tested fire-rated back boxes. Back-to-back sockets should be offset. Without this, a socket can become a weak point where fire passes through the wall.

Who needs a fire risk assessment?

Under the Regulatory Reform (Fire Safety) Order 2005, the responsible person for non-domestic premises, and for the common parts of blocks of flats and HMOs, must carry out a fire risk assessment. It often identifies walls, doors and fire stopping that need upgrading. Private single homes are not covered by the Order.

Get a free fire rated walls quote in Maesteg

Tell us what you need and we'll come back with a clear price.

Request a quote